EVO500S Platform Lift Installation - Hackney

EVO500S Platform Lift Installation - Hackney

Clapton Park Methodist Church serves the thriving and exciting London Borough of Hackney: spiritually, culturally, socially and economically diverse, the community  experiences many challenges so the Church must be able to engage with individuals and groups from all walks of life on a daily basis.

We supplied and installed an EVO500S Internal Platform Lift, custom built with a large extended platform of 1980mm and 500kg lifting capacity to facilitate coffin carriage. The lift serves two levels, foyer and chapel, with a travel distance of 2440mm and includes a fixed ramp and concealed closer to the lower door to accommodate a low ceiling height. The EVO500S lift series requires no lift shaft or external machine room which makes it an economical access solution, and, for the user, it’s fast, quiet and easy to use.